Saturday, 28 February 2009

Basement level -1


I'm sure this may need to go through more refinement but at least this is first past the post. I expect the walls to be 300m min. I've also made sure to pick up the lines of the structure above.

1 comment:

  1. I've made the basement foot print this shape as well to reduce the amount of insitu concrete poured. cut costs.
    lol

    ReplyDelete